Crimple Greenway
Harrogate Wildbelt
Reconnecting the
Crimple Valley
An overlooked railway corridor offers an intriguing possibility for reconnecting Harrogate with the extraordinary landscape of the Crimple Valley.
Crimple Greenway explores a continuous walking and cycling route connecting Pannal with the Yorkshire Showground and the wider Harrogate network, following the historic railway corridor where possible.
Building on existing cycling infrastructure plans, detailed feasibility studies and longstanding local ambitions, the proposal brings together transport, landscape, ecology and heritage.
Part of Harrogate Wildbelt, Crimple Greenway imagines how the town's former railway infrastructure could help establish a more connected, accessible and distinctive landscape for future generations.

Infomation
FOCUS
Landscape, ecology & active travel
GEOGRAPHY
Crimple Valley, Harrogate
approach
Research, mapping & route exploration
Status
Concept

Heritage
Monumental arrival
The Crimple Valley forms one of Harrogate's most dramatic approaches, its sweeping landscape crowned by an extraordinary feat of Victorian engineering.
Completed in 1848, the great Crimple Viaduct stretches more than half a kilometre across the valley on 31 monumental stone arches, rising 110 feet above the landscape. Built for the York and North Midland Railway, it was among the remarkable engineering achievements of the railway age, transforming the southern approach to the growing spa town.
The viaduct captured the imagination of its contemporaries. Celebrated in illustrated prints and nineteenth-century visitors' guides, it became a spectacle in its own right, an astonishing meeting of industrial ambition and picturesque countryside.
Beneath its arches ran another railway, part of the Leeds and Thirsk route, crossing the valley on the smaller Crimple Low Viaduct before continuing eastwards through Prospect Tunnel. Although this lower line closed in the twentieth century, its bridges, embankments and cuttings remain woven into the landscape.
Today, the great viaduct continues to carry trains into Harrogate, while the forgotten railway beneath it offers the possibility of a different kind of journey through the valley.


Groundwork
Building on existing ambitions
The idea of reconnecting Harrogate through its former railway corridors has a substantial history, supported by successive transport plans and feasibility studies.
The Harrogate Cycle Infrastructure Plan, prepared by WSP for North Yorkshire County Council in 2019, identified the importance of a Pannal–Harrogate connection, including gaps in the existing network and opportunities for new routes across the southern landscape.
Further east, Greenways and Cycleroutes developed proposals for a traffic-free route towards Spofforth. These were subsequently examined in Sustrans' 2023 feasibility study for National Cycle Network Route 67, including detailed investigations of Crimple Low Viaduct, Prospect Tunnel, ecology, engineering and potential delivery.
Parts of the historic corridor have already found new uses, including a bridleway created by Rudding Estate.
Together, these studies and interventions provide valuable groundwork. Crimple Greenway brings them into a wider landscape proposition, exploring how the missing connections between Pannal, the Common, the Showground and the town might be understood as part of one continuous network.

Network
A town of green connections
The success of the Nidderdale Greenway demonstrates how former railway infrastructure can become a valued part of everyday life, creating attractive connections between settlements, woodland and countryside.
Could Harrogate develop a wider network of green routes, connecting its river valleys, parks, neighbourhoods and surrounding villages?
Crimple Greenway offers an important piece of that possibility.
A route through Crimple Valley could connect Pannal with the proposed Crimple Common, cross the A61 Leeds Road and continue beneath the main railway viaduct towards the historic alignment and Yorkshire Showground.
To the east, the proposed connection through Prospect Tunnel towards Spofforth could extend the network to the Harland Way and Wetherby.
These routes also invite a larger question about how the town's green infrastructure might evolve, connecting with the Nidderdale Greenway and other established paths to create a more coherent network across Harrogate.
The opportunity is to think beyond individual paths, imagining a connected landscape that makes movement through the town and countryside more attractive, accessible and enjoyable.